Welcome to Case Studies

Discover how Colenet Ltd brings over four decades of specialist knowledge to every project we deliver. Our case studies illustrate the real-world impact of our work, from improving network resilience in hospitals to enabling smarter, safer and more connected environments all across the United Kingdom.

With a reputation built on reliability, responsiveness and quality craftsmanship, we take pride in helping organisations strengthen their digital foundations through future-ready data and fibre solutions.

These stories demonstrate why clients continue to trust Colenet ltd for their most important infrastructure needs.

qtq80-1eQVqs
qtq80-1Gpthk

Middlesex Hospital – Critical Communications Room Relocation (Hub-O2 to Roof Infrastructure)

 
We executed a full relocation of the hospital’s core communications room—transitioning 1,000+ active data points5 voice panels, and 5 fibre panels to a newly constructed roof-level facility.
All work was undertaken 100% out-of-hours, the plan ensured zero clinical downtime and 0 reported post-cutover faults.
Project duration: 16 November – 14 December 2024 (Friday–Monday nights)
 
Key Metrics:
  • 100% uptime maintained throughout the relocation
  • 1,100+ network endpoints successfully migrated
  • 4-week delivery, completed on schedule
Customer Impact: A more resilient communications backbone with improved environmental stability and future expansion capacity.

London Hospital – A&E and Mortuary COVID-19 Rapid Response Infrastructure

During the critical first wave of COVID-19 (March 2020–July 2020), our team enabled fast reconfiguration of the A&E department to support safer patient flow and reduce cross-infection risk.
We deployed additional Wi-Fi Access Points, expanded structured cabling, and delivered secure connectivity for mobile clinical devices used for triage and patient management.
In the Mortuary, we installed enhanced wireless coverage to support mobile tablet usage amid a 300% increase in workload during peak pandemic months.
 
Key Metrics:
  • 35+ new cabling runs installed in live clinical areas
  • 15+ Wi-Fi access points added to extend high-density coverage
  • 48-hour response time from initial request to deployment
  • 0 interruptions to critical A&E services during works
Customer Impact: Improved operational efficiency and safer clinical environments during unprecedented pressure on NHS services.
qtq80-mvMqOz
qtq80-WHa4Pa

Surrey Hospital – Oxehealth Patient Monitoring System Deployment

We delivered the installation of Oxehealth observation units across multiple wards, integrating structured data cabling and power infrastructure to meet NHS and manufacturer compliance.
Engineers operated under heightened safety measures, including escort-only access and mandatory panic alarm use due to the nature of the wards involved.
 
Key Metrics:
  • 60+ patient rooms upgraded with Oxehealth monitoring capability
  • 100% compliance with clinical safety and safeguarding protocols
  • Multi-building rollout completed ahead of schedule
Customer Impact: Enhanced patient safety, continuous monitoring capability, and reduced reliance on manual observation for at-risk individuals.

Middlesex Hospital, Theatre Development – Data & Wireless Infrastructure for New Surgical Suites

As part of the new theatre development programme, we installed approximately 500 new data outlets and multiple enterprise-grade Wi-Fi access points to support next-generation surgical equipment and digital clinical processes.
The project was delivered in phased stages, fully aligned with electrical and construction partners to meet strict commissioning deadlines.
 
Key Metrics:
  • 500+ new network outlets installed
  • 20+ Wi-Fi access points deployed across theatre zones
  • 100% on-time delivery, despite multi-contractor coordination
  • 0 defects recorded at final test and inspection
Customer Impact: A high-capacity, future-proof network enabling the opening of state-of-the-art surgical spaces with seamless connectivity for staff and equipment.
qtq80-FcXzgk